Skip to main content

Get in touch

Dawber Williamson Ceilings Ltd

Unit 2, Carmel Park, Saltmarsh Court, Priory Park East, Hull, HU4 7DZ

01482 328766

Dawbers plastering works

Tape & Fill / Plastering

Upon completion of fitting boards, we adopt the tape jointing method, designed for bringing plasterboard up to a standard that is ready for professional, snag free decoration.

It is a quick, professional quality approach making use of purpose designed bedding tape and jointing compounds. Applying three coat formulations to walls we are able to achieve a standard that could only once be achieved through the prolonged method of plastering.

Once everything has properly dried we sand down the jointing compound to a perfect, smooth surface where it is now ready to be painted.

Our Specialist plastering service includes:
  • Board setting and skimming
  • Two coat plastering to masonry and concrete
  • One coat renovation plaster

We are conversant with all forms of internal plastered finishes and all market leading systems from all manufacturers and our dedicated specialist team ensures the highest possible level of finish.

For further details on our plastering service, please call 01482 328766.

Dawber Williamson Ceilings Partitions fit out works at Middleton Hall Hull University DWC 2 Middleton Hall fit out works complete 10

Education | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering

Middleton Hall - Hull University

View project
Dawber Williamson Ceilings Partitions at Aura Innovation Centre Hessle DWC 20 Dawber Williamson Ceilings Partitions at Aura Innovation Centre Hessle DWC 39

Commercial | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Aura Innovation Centre

View project
Dawbers drylining works at the new Porsche Centre Hull 11 Dawbers drylining works at the new Porsche Centre Hull 20

Commercial | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining | Tape & Fill / Plastering

Porsche Centre - Bridgehead South Business Park Hull

View project
IMG 4338 IMG 4574

Commercial | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering

Croda Distribution Centre - Goole

View project
Dawbers dryling at Dong Energy 1 Dawbers dryling at Dong Energy 5

Commercial | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Dong Energy - Grimsby

View project
Dawber Williamson Ceilings Partitions at Hull New Theatre DWC 10 Dawbers at Hull New Theatre DWC 2

Commercial | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining | Tape & Fill / Plastering

Hull New Theatre

View project
Dawber Williamson Ceilings Partitions at Riverside School Goole DWC 6 Dawber Williamson Ceilings Partitions at Riverside School Goole DWC 11

Education | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Goole - Riverside School

View project

We’re here to help. Send us a message and we’ll be in touch.

Get in touch