Skip to main content

Get in touch

Dawber Williamson Ceilings Ltd

Unit 2, Carmel Park, Saltmarsh Court, Priory Park East, Hull, HU4 7DZ

01482 328766

Project Background image

County Hall Offices - Beverley

Sector

Public Sector

Service

Passive Fire Protection

Fire Stopping

MF Ceilings

Dry Lining

Tape & Fill / Plastering

Passive Fire Survey

Location

Beverley

Client

County Hall Offices

Internal finish at County Hall office

We are working alongside English Heritage & Tarmac specialist plaster products in the plastering refurbishment works at County Hall offices using traditional lath & plaster. The refurbishment specification was to strip back all plasterwork and reinstate as per the original 1900's construction which was a Lath and plaster build up.

Lath and plaster is a technique which was first used to finish interior walls and ceilings from the early-18th until the early-to-mid-20th century. It was then generally superseded by drywall techniques and plasterboard.

The process involved laths (thin strips of timber) nailed to timber joists or posts and then covered with built-up layers of plaster. Laths typically measure 25 mm x 6 mm, and are positioned about 6 mm apart from each other to allow the plaster to penetrate into the gaps between them.

Dawbers working on SFS at Siemens New Train Manufacturing Facility ITHP6025

Commercial | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Siemens New Train Manufacturing Facility - Goole

View project
The Alchemist - Embassy Gardens - London - Hospitality Project IMG 6074lo 1400x900

Retail & Leisure | MF Ceilings | Suspended Ceilings | Dry Lining

The Alchemist - Embassy Gardens - London

View project
Battersea Power Station Upcoming arcade at Battersea Power Station

Retail & Leisure | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Glazed Office Partitions

New Food Hall at Battersea Power Station

View project
IMG 0526 IMG 0092

Commercial | MF Ceilings | Suspended Ceilings | Dry Lining

Birmingham International Airport

View project
Burger King Workshop - Ceiling & Partitions work by Dawber Williamson Ceilings & Partitions project - Burger King - Worksop

Retail & Leisure | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining

Burger King - Worksop

View project
Staff House at Hull University MF Ceiling by DWC at the Staff House in Hull University

Education | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Staff House - Hull University

View project
MF/Suspended Ceiling provided by DWC Dong Energy, Grimsby

Commercial | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Dong Energy - Grimsby

View project
Sancarlo 1 San Carlo - Manchester Airport - Ceilings & Partitions

Retail & Leisure | Passive Fire Protection | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering

San Carlow - T2 Manchester Airport Extension

View project
IMG 5987 IMG 6422

Commercial | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining

New Porsche Showroom - York

View project
SFS Structural Framing System at Chesterfield Waterside Offices SFS Structural Framing System at Chesterfield Waterside Offices by Dawbers

Commercial | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining

Chesterfield Waterside Offices

View project
IMG 7867 IMG 7865

Retail & Leisure | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering

Five Guys - Manchester Piccadilly

View project
DWC at Goole Riverside School 20180215 144109374 i OS

Education | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Goole - Riverside School

View project

We’re here to help. Send us a message and we’ll be in touch.

Get in touch