Skip to main content

Get in touch

Dawber Williamson Ceilings Ltd

Unit 2, Carmel Park, Saltmarsh Court, Priory Park East, Hull, HU4 7DZ

01482 328766

Project Background image

Croda Distribution Centre - Goole

Sector

Commercial

Service

MF Ceilings

Suspended Ceilings

Dry Lining

Tape & Fill / Plastering

Location

Goole

Client

Croda Distribution Centre

Exterior Croda Distribution Centre - Dry lining by DWC

We were delighted to be involved with the interal construction of the new Croda Chemical facility on the Goole 36 Enterprise Zone. Once complete will be a worldwide distribution hub for products made at its three northern UK manufacturing sites and for the European delivery of products made across its global network. Yorkshire-headquartered GMI Construction were appointed as lead contractor on the project, which will be overseen by logistics specialist Tritax Symmetry.

Scope of Works

Drylining - MF/Suspended Ceilings - Plastering - Fire Stopping

Jumbo Stud 432 m²
Stud 2145 m²
Insulation 2145 m²
Boarding (Duraline) 5237.4 m²
Plywood 3412 m²
Dot and Dab 80 m²
Skim 4334.7 m²
Suspended Ceilings 1746 m²
MF Ceilings 156 m²

Passive Fire Control / Register

Air Sealing Works

Dawbers working on SFS at Siemens New Train Manufacturing Facility ITHP6025

Commercial | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Siemens New Train Manufacturing Facility - Goole

View project
The Alchemist - Embassy Gardens - London - Hospitality Project IMG 6074lo 1400x900

Retail & Leisure | MF Ceilings | Suspended Ceilings | Dry Lining

The Alchemist - Embassy Gardens - London

View project
Battersea Power Station Upcoming arcade at Battersea Power Station

Retail & Leisure | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Glazed Office Partitions

New Food Hall at Battersea Power Station

View project
IMG 0526 IMG 0092

Commercial | MF Ceilings | Suspended Ceilings | Dry Lining

Birmingham International Airport

View project
Burger King Workshop - Ceiling & Partitions work by Dawber Williamson Ceilings & Partitions project - Burger King - Worksop

Retail & Leisure | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining

Burger King - Worksop

View project
Staff House at Hull University MF Ceiling by DWC at the Staff House in Hull University

Education | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Staff House - Hull University

View project
MF/Suspended Ceiling provided by DWC Dong Energy, Grimsby

Commercial | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Dong Energy - Grimsby

View project
Sancarlo 1 San Carlo - Manchester Airport - Ceilings & Partitions

Retail & Leisure | Passive Fire Protection | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering

San Carlow - T2 Manchester Airport Extension

View project
IMG 5987 IMG 6422

Commercial | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining

New Porsche Showroom - York

View project
SFS Structural Framing System at Chesterfield Waterside Offices SFS Structural Framing System at Chesterfield Waterside Offices by Dawbers

Commercial | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining

Chesterfield Waterside Offices

View project
IMG 7867 IMG 7865

Retail & Leisure | Fire Stopping | MF Ceilings | Suspended Ceilings | Dry Lining | Tape & Fill / Plastering

Five Guys - Manchester Piccadilly

View project
DWC at Goole Riverside School 20180215 144109374 i OS

Education | Fire Stopping | MF Ceilings | Suspended Ceilings | SFS - Structural Framing System | Dry Lining | Tape & Fill / Plastering | Acoustic / Air Sealing Works

Goole - Riverside School

View project

We’re here to help. Send us a message and we’ll be in touch.

Get in touch