We were delighted to have been involved in the drylining works at the Howdens manufacturing site in Howden, our works involved installing a large partition to divide one of the main manufacturing warehouses into two, we installed a fire rated umbrella detail on the dividing line, then built a twin 70mm stud partition covered in two layers of fire line plasterboard to each side of the partition.