A comprehensive Passive Fire Stopping survey was carried out at the newly constructed Aldergate Vets new premises, all 367 penetrations were fire stopped using ablative Batt & intumescent Mastic. Air sealing works were carried out by sealing the perimeter of the building with a plasterboard bulkhead.